At Kinlan Brickwork Ltd, we recently had the privilege of hosting a visit from Corofil one of our firestopping manufacturers, we passed with flying colours. It is such an important part and therefore to ensure the proper fit is maintained and the highest level of quality assurance we undertake these steps:
1. Training and Expertise: Our operatives undergo comprehensive training on the correct installation techniques for firestopping. They are equipped with the necessary knowledge and skills to handle various types of firestopping products effectively.
2. Bespoke QA System: We have developed a bespoke Quality Assurance (QA) system specifically designed for firestopping installations. This system tracks every stage of the process, from purchasing the product to delivering it to the site, installation, and final checks. By recording each step, we ensure that there are no mistakes or oversights in the fitting process.
3. Meticulous Documentation: We maintain detailed records for every firestopping installation we carry out. This documentation includes product specifications, installation procedures, and any additional measures taken to ensure compliance with regulations. These records serve as evidence of our commitment to quality and allow us to provide proof of correct installation.
4. IFC Accreditation: Kinlan Brickwork Ltd is proud to have IFC accreditation, which demonstrates our adherence to the highest standards of fire safety. This accreditation ensures that we consistently meet all necessary requirements and regulations when dealing with the installation of fire products.
5. Continuous Improvement: We are committed to staying updated with the latest advancements and best practices in firestopping. We regularly review our processes, seek feedback from manufacturers and industry experts, and invest in ongoing training for our operatives. This commitment to continuous improvement ensures that we consistently deliver the most effective firestopping solutions.
By implementing these measures, Kinlan Brickwork Ltd ensures that firestopping installations are carried out correctly, minimizing the risk of fire spread and ensuring the safety and integrity of buildings. We take pride in our attention to detail and commitment to providing exceptional quality to our clients.
MORE ARTICLES
A different view from Tariff Street, Manchester — and a project that’s really starting to speak for itself 🏙️
The façade is coming together with a sharp, consistent finish, and the lighter brick is giving the building a clean, modern feel 🧱✨
🚧 Water Lane, Leeds – Quality Check in Action! 🚧
A little time on set-up saves hours later! From clamping pistols on top-level masonry supports, to dropping string lines 🧵 and keeping every pillar true to line — getting it right from the start is everything 💯
Another great look at progress over at Lumina Village in Manchester 👏
With the sunshine lighting up the site, it’s a proper showcase of the quality and detail the team have been delivering throughout. The brickwork is really starting to stand out now, bringing the whole development to life as we move closer to completion.
Our apprentice hard at work 💪🏻
Our apprentice hard at work on the Premier Inn site on Rochdale Road, Manchester, carrying out patching works 👷♂️
Happy St. Patrick’s Day 🍀
In construction, luck doesn’t build anything that lasts…..Standards and Values do.
🏗️ Premier Inn Project Update 🏨
The scaffold strike continues over at Premier Inn, and great progress is being made on site.
🎉 We’re proud to share that Kinlan Brickwork has been recognised as a Tameside 500 Champion 🎉
This award recognises our commitment to apprenticeships, training, and skills across Tameside — and during National Apprenticeship Week, it’s the perfect time to celebrate the people behind that commitment 🙌
✨ Project Progress Update ✨
We’re proud to see the Dakota Hotel at Manchester Airport approaching completion 🏨✈️
📍 Tariff Street – Project Update
Great progress continuing on site at Tariff Street. Mast climbers 13 & 14 to Block 2 have now been successfully removed, marking another key milestone.